Projects
Our Projects
Your Next Project,Cooperate with Us

Hainan ,China
Thoroughly tested the product performance under tropical and subtropical climate conditions

Qinghai,China
The total length of the line is 40.4 kilometers. The terrain along the line is mostly flat with small undulations and is relatively open.

Xizang,China
The cold recycling technology of emulsified asphalt mixture was employed. The recycled asphalt pavement milling materials were re-screened and a new mix ratio was designed. Emulsified asphalt, cement, mineral powder, crushed stones and other materials were added, and then mixed in the cold mixing equipment to form new road construction materials.

Russia
Altai Krai

Combodia
NR3 Rode

Kampot,Combodia
33 Road
