Projects

Your Next Project,Cooperate with Us

1

Hainan ,China

Thoroughly tested the product performance under tropical and subtropical climate conditions

2

Qinghai,China

The total length of the line is 40.4 kilometers. The terrain along the line is mostly flat with small undulations and is relatively open.

4

Xizang,China

The cold recycling technology of emulsified asphalt mixture was employed. The recycled asphalt pavement milling materials were re-screened and a new mix ratio was designed. Emulsified asphalt, cement, mineral powder, crushed stones and other materials were added, and then mixed in the cold mixing equipment to form new road construction materials.

5

Russia

Altai Krai

c091fbf737cf2026f87b2adf62c91310

Combodia

NR3 Rode

Kampot,Combodia

33 Road

This field is required.
This field is required.
This field is required.